s
Leading Manufacturer of Photovoltaic (PV) mounting systems and a variety of structural roof attachments designed for the professional installer

 

COMPANY INFO

ENGINEERING TECHNICAL INFO.
 SITE MAP  |  TERMS  |  HOME PAGE

PV MOUNTING SYSTEMS
   SolarWedge XD (NEW!) 
   SolarWedge
   RoofTrac
   GroundTrac
STRUCTURAL ATTACHMENT
   FoamJack
   FastJack - Residential
   FastJack - Commercial
   TileTrac
PV ACCESSORIES
   End Caps 
   FastJack Leveling Kit 
   XD Splice Kit 
   Flashing Template
   Tilt Up Kit - For RoofTrac
   Unibit
   Splice Kit
   Oatey Solar Flashings
PV INSTALLATION GUIDES
   SolarWedge XD 
   SolarWedge 
   RoofTrac - Residential
   GroundTrac
   FastJack
   TileTrac
   Splice Kit
   Tilt Up Kit

Licensed Contractors Only:
Tel: 805-486-4700
Fax: 805-486-4799

 

Tile Trac Home Installation
Guide
(PDF)
Composition Roof Install Tile Roof Install FAQ's
TILE ROOF
STEP 1: SELECT A TILE IN THE AREA OF THE ROOF RAFTER. STEP 2: REMOVE THE TILE BY PUSHING AND PULLING THE TILE.  IT IS USUALLY HELD IN PLACE BY A SMALL NAIL.
STEP 3: AFTER REMOVING THE ROOF TILE, LOCATE THE RAFTER EITHER BY TAPPING WITH A HAMMER OR  USING AN ELECTRONIC STUD SENSOR. STEP 4: UPON LOCATING THE RAFTER CENTER, MARK A REFERENCE POINT ON THE TILE ABOVE.
STEP 5: APPLY MASTIC SEAL TO THE HOLE THAT HELD THE TILE IN PLACE. STEP 6: DRILL SEVERAL HOLES IF NECESSARY TO LOCATE THE CENTER OF THE RAFTER.  A 3/16" CARBIDE BIT IS RECOMMENDED.
STEP 7: INSERT THE LAG BOLT AND WASHER THROUGH THE TILE TRAC® AND APPLY MASTIC TO THE BASE. STEP 8: INSTALL THE LAG BOLT INTO THE ROOF USING A 1/2" SOCKET DRIVE. THE MASTIC SHOULD FLOW OUTWARD SEALING ANY HOLES MADE TO LOCATE THE RAFTER.
STEP 9: AFTER BOLTING THE TILE TRAC® TO THE ROOF, SLIDE THE UPPER CARRIAGE INTO CORRECT POSITION UNDER THE CROWN OF THE TILE. STEP 10: REPLACE THE TILE.  BY LINING UP THE SNAP LINES, THE TILE IS NOW READY TO BE MARKED AND DRILLED.
STEP 11: USING A 3/8" CARBIDE BIT AND A ROTARY HAMMER, DRILL THROUGH THE TILE AT THE INTERSECTION OF THE CHALK LINE AND THE REFERENCE MARKS. STEP 12: LIFT THE TILE SLIGHTLY TO SLIDE THE UPPER TILE TRAC® CARRIAGE IN ALIGNMENT WITH THE HOLE IN THE TILE.
STEP 13: TWO 9/16" WRENCHES ARE REQUIRED TO BIND THE NUTS TOGETHER ON THE 3/8" SHAFT. IT IS HELPFUL TO PLACE A WASHER BETWEEN THE NUTS BEFORE TIGHTENING. STEP 14: INSERT THE THREADED SHAFT THROUGH THE TILE INTO THE UPPER CARRIAGE TIGHTEN DOWN USING A 9/16" WRENCH. 
STEP 15: APPLY SEALANT AROUND THE THREADED SHAFT AND COMPRESS WITH 3/8" WASHER INCLUDED IN THE KIT. THE BOX END OF THE WRENCH CAN USED FOR THIS. STEP 16: APPLY UV RATED SEALANT AROUND THE TOP OF THE WASHER TO COMPLETE THE  SEAL. THE TILE IS NOW COMPLETELY WATERPROOF.